INSTALLATION
To avoid common errors, unnecessary troubleshooting and make the installation more efficient we suggest the following installation
sequence:
1. Understand UltraGuard ZONED and BASIC modes of operation vs. your installation requirements and capabilities.
2. Plan detectors and monitor placement.
3. Wire the facility/residence.
4. Install UltraGuard CO detectors.
5. Turn off the furnace power.
6. Install UltraGuard Monitor.
7. Connect UltraGuard Monitor to furnace circuit.
8. Connect UltraGuard CO detectors wires to monitor.
9. Place J7 on the UltraGuard Monitor board into CONFIG position.
10. Power the UltraGuard system. Wait as the monitor goes through configuration sequence.
11. Test the system (individual detectors and the monitor).
12. Connect UltraGuard Monitor to alarm panel.
PRELIMINARY THINGS YOU NEED TO KNOW
Knowing the answer to the following will help you set up for installation:
· What power source you will use to power the UltraGuard?
You have two choices:
1. Auxiliary Alarm Panel power supply.
2. Stand Alone backup power supply such as Altronix Model AL300ULX.
· How many CO Detectors are required in this installation?
You can install 5 detectors per UltraGuard zone (20 detectors total).
· If you are connecting the UltraGuard to an alarm panel how many zones are available in the panel?
The number of zones in the alarm panel affects the manner and number of signals the UltraGuard can send to the alarm
panel.
To fully utilize UltraGuards potential the alarm panel has to have 6 free zones if ALL UltraGuards detector zones are
wired. Please read Understanding UltraGuards Zones section carefully!
· Do you need to install additional external audio alarms/piezos?
UltraGuard can handle three additional external piezo alarms.
Note that the installation of piezos will use one zone on the UltraGuard board and thereby reduce the total number of
CO Detectors you can install to 15.
· How will you connect the UltraGuard Monitor to a furnace?
You can shutdown the furnace by connecting to either high voltage (emergency switch) or low voltage (at thermostat)
circuits.
6